Here are the latest News from celduc : discover our SSRs with Integrated Diagnostic functions, learn the procedure for testing the operation of a SSR, ...
View in browser
logo_celduc_inc_violet

Monthly News

June 2025

Dear  ,

Here are the latest News from celduc® relais over the past month :

Niveau1_relais-diag_EN

Integrated Diagnostic functions for real-time monitoring

 

In order for machine builders to make informed decisions, solve urgent problems on short notice and develop machines that are more autonomous, data from the various components within the machine needs to be collected and analysed. celduc® relais has developed a range of Solid State Relays with diagnostic functionality that meet these requirements :

  • To detect load failures, blown fuses, heat zones status, as well as damaged and interrupted SSRs
  • Reduced unplanned downtime
  • Predictive and better preventive maintenance plans
Want to know more ?

Niveau2-specific-sensors

Magnetic proximity sensors for customer-specific requirements

 

If you cannot find the right product for your application, don’t worry we can even design a specific product that meets your requirements: more than 70% of our sensors are manufactured in accordance with customer specifications

The design of the housing, the material, the contact type or the cable length and connection type, … can be adapted to the specific requirements.

Want to know more ?
Niveau2-testing-operation-SSR

Procedure for testing the operation of a Solid State Relay

 

Here is a tutorial on how to perform an operational on-off test on a solid state relay. 

We remind you that our products are 100% tested and have strict control at different steps of the production. This tutorial has been created to show how to do an operational on-off test only for very specific situations.

By following these steps, you can effectively test a solid state relay and confirm the functionality of its input and output circuits.

Watch the video

Niveau3_K-2025

A must-attend event  in the plastics and rubber industry

More information
Niveau3-YouTube_2

Subscribe to our channel to receive instant updates !

Subscribe
summer-holidays-2025

Summer Closure

celduc will be closed weeks 32-33-34 (from August, 4th to August, 25th)

LinkedIn
YouTube
Website
bouton_blog

celduc® inc., 434 E. Main Street, #429,, Centerport, NY 11721, USA, Phone : 312-420-0519

Unsubscribe Manage preferences